Hillsborough MPO Transportation Vulnerability Assessment Pilot Project (2014)

slider_vulnerabilityassessment

The Hillsborough County MPO, Planning Commission, Hillsborough County Public Works-Hazard Mitigation Section, the University of South Florida, and the Tampa Bay Regional Planning Council received a grant from the Federal Highway Administration (FHWA) to conduct a pilot project to assess the resiliency of the transportation system in Hillsborough County. Federal, State DOT, and local resiliency planning information will be used to assess the transportation network’s vulnerability to:

  1. Sea level rise
  2. Storm surge
  3. Inland flooding

As described in the following grant proposal, this project facilitated the identification of adaptation strategies for incorporation into the MPO’s 2040 Long Range Transportation Plan.

HC MPO – VA Assessment Project Proposal

Conference Poster of the Study

Volunteer Hours

Local Mitigation Strategy Working Group & Meetings

The County’s Local Mitigation Strategy Working Group served as the stakeholder group for this project, with all meetings held on the 22nd floor of the County Center (601 E. Kennedy Blvd. in downtown Tampa; with the exception of the October 16th meeting) and  open to the public. View meeting date topics in detail.

Meeting Documents

[one_third_first]

October 16th, 2013

Agenda Packet:

Final Agenda

Summary & Presentations:

Meeting Summary

Summary of Update to Flood Insurance 2012 Reform Act

Flood Insurance Comparative Rates Presentation

March 11th, 2014

Agenda packet:

Agenda Part A

Agenda Part B

Meeting Minutes- LMS_WG-Part A

Meeting Minutes- FHWA- Part B

Phase 1 -Technical Memo (Draft 3-4-14)

[/one_third_first]

[one_third]

November 4th, 2013

Agenda packet:

Cancelled 

Summary & Presentations:

Meeting items postponed to Dec. 10th 

Please visit the site for future updates 

 

 

May 6th, 2014

Agenda packet:

Cancelled 

Summary & Presentations:

Meeting items postponed to May 29th. 

Please visit the site for future updates 

 

 

 

 

[/one_third]

[one_third]

December 10th, 2013

Agenda packet:

Final Agenda

Summary & Presentations:

Meeting Summary Part A- LMS WG

Meeting Summary Part B- Pilot Study

Vulnerability Assessment Presentation

 

May 29th, 2014

Agenda packet:

Agenda Part A- LMS_WG

Agenda Part B-FHWA

Summary & Presentations

Vulnerability Assessment Presentation-Final

Meeting Notes Part B-FHWA

[/one_third]

[divider type=”shadow”]

Additional Resources

Sea Level Scenarios Sketch Planning Tool: Map viewer, GIS layers of inundation, and a GIS tool for creating your own inundation layers

Contacts

For more information and accommodations for the meetings, contact Susana Alvarado at alvarados@plancom.org or 813.273.3774 x355. If Susana cannot be reached, contact Allison Yeh yeha@plancom.org or 813.273.3774 x351


Posted

in

,

by

Tags: