Electric vehicle charging stations in Pierce Street Parking Garage

Electric Vehicle Infrastructure Plan (EVIP)

Electric vehicle charging stations in Pierce Street Parking Garage

Project Overview

Framed by a growing demand for electric vehicles, and the recently passed Bipartisan Infrastructure Law (BIL) that will provide the Florida Department of Transportation (FDOT) with $198 million, the need for a local electric vehicle infrastructure plan has never been greater. The purpose of this plan is to identify locations where Electric Vehicle (EV) infrastructure can be deployed, provide a framework for prioritizing charging stations, and give policymakers guidance on implementing compatible land development codes.

Scope of the Study

  • Research electric vehicle fundamentals and industry background and review relevant current and previous EV plans
  • Conduct public outreach including advisory committee meetings, stakeholder listening sessions, and a public survey
  • Prepare an existing conditions analysis including existing EV infrastructure, equitable access, existing land-use analysis, and a local jurisdiction development and zoning regulations audit
  • Provide EV adoption scenarios and forecasts and identify needs
  • Provide recommendations for EV charing locations with an equitable access analysis, a framework for prioritizing EV charging locations, and policy recommendations to local jurisdictions
  • Develop a final report

Phase 1

Electric Vehicle Fundamentals and Industry Background Research

December 2022

Phase 2

Public Outreach and Stakeholder Engagement

January-March 2023

Phase 3

Existing Conditions Analysis

January 2023

Phase 4

Electric Vehicle Adoption Scenarios/ Forecast Analysis

February- April 2023

Phase 5

Recommendations

 

April-June 2023

Phase 6

Final Report

May-July 2023

Public Engagement

Take our public survey!

Take our 3-minute survey so we can help plan for charging needs in your neighborhood:


Click here!

Status

Phase 1

Complete

Phase 2

Ongoing

Phase 3

Complete

Phase 24

Ongoing

Documents

Project Plans & Studies

Existing Conditions Report

Supporting Documents

check back soon

Past Presentations & Events

Existing Conditions Presentation

Maps

check back soon

Contact

Connor MacDonald

813-946-5334

macdonaldc@plancom.org


Posted

in

by

Tags: